ZE485E‑10‑5061 — Jul 2020 | 4,788 hrs | Parked in Weinan | With bucket

ZE485E‑10‑5061 — Jul 2020 | 4,788 hrs | Parked in Weinan | With bucket

$97,120.00
促销价  $97,120.00 常规价格 
跳至产品信息
ZE485E‑10‑5061 — Jul 2020 | 4,788 hrs | Parked in Weinan | With bucket

ZE485E‑10‑5061 — Jul 2020 | 4,788 hrs | Parked in Weinan | With bucket

$97,120.00
促销价  $97,120.00 常规价格 

Summary

  • Model/ID: ZE485E‑10‑5061
  • Manufacture: July 2020
  • Hours: 4,788 (relatively high)
  • Location/status: Parked in Weinan
  • Attachment: Bucket

Key risks

  • High cumulative hours → likely wear on engine, hydraulic pumps, travel motors, swing components and undercarriage.
  • Long-term parked condition → possible battery drain, seal deterioration, fuel/hydraulic contamination, surface corrosion.
  • Bucket wear → teeth, cutting edge, pins and linkages likely worn or loose.
  • Common issues on high-hour units: reduced hydraulic/pump efficiency, oil overheating, cylinder leaks, worn final drives/rollers, pin/bushing play, weld repairs.

Priority pre-purchase checks

  1. Verify VIN/engine numbers and full maintenance/service records.
  2. Start and dynamic test: cold/hot starts, smoke, unusual noises, idle stability.
  3. Hydraulic inspection: visible leaks, oil color/contamination, pressure and flow test under load (with bucket).
  4. Oil analysis: engine, hydraulic and final drive samples for wear metals, contamination, water.
  5. Undercarriage inspection: track/chain, shoes, sprockets, rollers, idlers wear measurements.
  6. Boom/arm and pins: pin/bushing wear, play, welds or crack repairs.
  7. Swing bearing and swing system: play and seal condition.
  8. Bucket: teeth, edge, side wear, pin condition and mounting integrity.
  9. Electrical & controls: diagnostic fault codes, joystick response, gauges, HVAC.
  10. Request records for major repairs/replacements (pumps, engine rebuilds, final drives).

Recommended next steps

  • Ask seller for high-resolution photos and videos: engine bay, hydraulic tank cap (oil), undercarriage, boom/arm pins, bucket close-ups, machine starting and working with bucket.
  • Arrange a site inspection that includes hydraulic pressure/flow test and oil analysis.
  • If seriously considering purchase, perform a short working trial and/or hire a third‑party inspector.
  • Get cost estimates for likely replacement/repair items based on inspection results (e.g., pumps, final drives, pins, seals).

You may also like